Where did all that sand come from?

Here are some photos of sand being dredged from the Fraser River for the pre-loading of the route of the South Fraser Perimeter Freeway:

Three large sand stockpiles were dredged – on 80th Street near the Delta Animal Shelter, on River Road near Nordel Way and in Surrey near Tannery Road.

As well, they are digging up more farmland in the Fraser Valley to supply sand and gravel for Gateway road construction:
See the STOP GATEWAY post on Farmland in Chilliwack being destroyed for gravel extraction.
See this Youtube Video of a South Surrey Tree Farm destroyed for gravel extraction.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s